CLV REPAIR
Polymer- and Fibre-Reinforced Repair Mortar
CLV REPAIR is a ready-to-use, class R4, cementitious, impermeable, fibre- and polymer-reinforced, thixotropic, high-performance structural repair mortar. EN 1504-3/R4
• High adhesion to concrete and steel.
• Mixed with water only; easy to apply.
• Thixotropic.
• Resistant to freeze–thaw.
• Resistance to chemicals.
• Resistance to the effects of sulphates and chlorides.
• No shrinkage.
• The material can also be applied by spraying.
• Chloride-free.
• Fibre-reinforced.
• Provides impermeability.
• Resistant to high pressure.

FEATURES AND BENEFITS
-
• High adhesion to concrete and steel. • Mixed with water only; easy to apply. • Thixotropic. • Resistant to freeze–thaw. • Chemical resistance. • Resistance to sulphate and chloride attack. • Does not shrink. • Can also be applied by spraying. • Chloride-free. • Fibre-reinforced. • Provides impermeability. • Resistant to high pressure.
FIELDS OF APPLICATION
-
• In all reinforced concrete structures requiring structural repair and restoration. • In protecting concrete against sulphate and chloride attack. • In balcony repairs, at column edges and in floor surface repairs. • In filling tie-rod holes and core holes. • In the repair and maintenance of marine structures. • Used in the repair of bare concrete surfaces.
Product Details
19.5 kg/m² of powder per 1 cm thickness
25 kg kraft paper bag
Shelf life is 1 year from the date of production when stored in the original packaging at +5 °C to +25 °C in ventilated, dry and sheltered conditions, protected from sun, rain and frost.
| PROPERTY | TEST METHOD | VALUE |
|---|---|---|
| Material Base | Clever Lab. | Cementitious, fibre/polymer-reinforced |
| Colour | Clever Lab. | Grey |
| Mixed density | Clever Lab. | 2–2.50 kg/L |
| Mixing Water Ratio | Clever Lab. | 16%–18 |
| Workable Life | Clever Lab. | 40 min (20 °C) |
| Waiting Time between Coats | Clever Lab. | 3–4 h |
| Application Temperature | Clever Lab. | +5 °C to +30 °C |
| Service Temperature | Clever Lab. | −20 °C to +350 °C |
| Application Thickness | Clever Lab. | 10–40 mm |
| Chloride Ion Content | Clever Lab. | ≤0.05 |
| Compressive Strength | Clever Lab. | 65 N/mm² (28 days) |
| Capillary Absorption | Clever Lab. | ≤0.5 kg/(m²·h⁰·⁵) |
| Modulus of Elasticity | Clever Lab. | 20,000 N/mm² (28 days) |
| Bond Strength | Clever Lab. | 2 N/mm² |
Application
• SURFACE PREPARATION
All loose parts on the substrate to be treated must be broken out and removed, and the surface must be roughened. The edges of the repair area must be cut perpendicular, with a depth of at least 0.2 cm. Rust on the reinforcement must be removed and, if necessary, new reinforcement must be added. If there is running water on the surface, seepage and running water must be stopped with a rapid-setting water-stop plug. The surface must be completely free from substances that impair adhesion, such as oil and paint. The substrate must be pre-wetted before application; in very hot and windy weather it is saturated with water. However, there must be no standing water on the surface.
• MIXING
For a 25 kg bag, add to 4–4.5 L of water depending on the ambient temperature. Pour the required amount of water into a clean bucket. Add the required amount of powder and mix with a mixer for 4 min until a homogeneous, lump-free mortar is obtained. Allow the material to stand for 1–2 minutes, then mix again for about 1 minute before starting application.
• APPLICATION
CLV REPAIR mortar is applied by trowel or by spraying. It can be applied in a single coat with a thickness of 10–40 mm per coat. For applications thicker than 40 mm, the second coat must be applied in the same way once the first coat has dried. Additional coats must be applied after 24 hours. Final levelling and finishing is carried out with a wooden or plastic float at the initial set of the mortar.
In hot conditions: store the bags in the shade, use cold mixing water, and apply quickly and without interruption in the morning and late afternoon. In cold conditions: store the bags indoors, use warm mixing water, start application towards midday and make sure that the structure has not been affected by frost. In very dry, windy conditions or under direct sunlight, the applied surface must be protected for 24–48 hours.