ClvSeal EP PRIMER 620
Two-Component Epoxy Primer, Levelling Mortar, Intermediate Coat and Mortar Coating
ClvSeal EP PRIMER 620 is a two-component, low-viscosity, multi-purpose epoxy primer.
• Easy application.
• Multi-purpose use.
• Fast curing.
• Low viscosity.
• Good penetration.
• Excellent adhesion.

FEATURES AND BENEFITS
-
• Easy application.
• Multi-purpose use.
• Fast curing.
• Low viscosity.
• Good penetration.
• Excellent adhesion.
FIELDS OF APPLICATION
-
• Concrete, cement screeds and epoxy mortars
• Normally absorbent and highly absorbent substrates
• Primer prior to spray-applied polyurethane/polyurea
• Primer on polyurethane/polyurea prior to tile adhesive
Product Details
1–2 × 0.35–0.55 kg/m² Consumption may vary when used as a repair mortar or filler and depending on surface roughness.
Component A: 18.96 kg metal pail Component B: 5.04 kg metal pail A+B kit: 24 kg
Store the product in its unopened original packaging at temperatures between +5 °C and +25 °C for a maximum of 24 months. Once opened, use the product as soon as possible.
| PROPERTY | TEST METHOD | VALUE | ||
|---|---|---|---|---|
| Product Type | Clever Lab. | Epoxy | ||
| Mixed density | ASTM D 1475 / EN ISO 2811-1 (+20 °C) | 1.04 g/cm³ | ||
| Mixing Ratio | Clever Lab. | A:B = 79:21 (by weight) | ||
| Application Temperature | Clever Lab. | +10 °C to +30 °C | ||
| Working Time | Clever Lab. | Condition | Time | |
| +10 °C | ~50 min | |||
| +20 °C | ~25 min | |||
| +30 °C | ~15 min | |||
| Initial Curing Time | Clever Lab. | Substrate Temperature | Min. | Max. |
| +10 °C | 24 h | 4 days | ||
| +20 °C | 12 h | 2 days | ||
| +30 °C | 8 h | 24 h | ||
Application
• SURFACE PREPARATION
Before application, concrete substrates must be clean, sound and of adequate compressive strength (at least 25 N/mm²), with a pull-off strength of at least 1.5 N/mm². The substrate must be clean, dry and free from foreign matter such as dirt, oil, grease, coatings and surface curing compounds. Concrete substrates must be prepared using abrasive equipment to remove cement laitance and achieve an open-textured surface. Weak concrete must be removed, and blowholes and voids must be fully exposed. Substrate repairs, filling of blowholes/voids and surface levelling must be carried out. Dust and loose and friable particles must be removed from the surface before application of the product, preferably by brushing and/or vacuuming.
• APPLICATION
Before application, check that the substrate moisture, relative humidity and dew point conditions are suitable. Can be applied by brush, roller or pin rake. Primer: Ensure that a continuous, pore-free coat covers the surface. Apply two coats of primer if necessary. Can be applied by brush, roller or pin rake. Levelling Mortar: Rough surfaces must be levelled first. The levelling mortar can be applied with a notched trowel/pin rake, depending on the required thickness. Intermediate Coat: Pour onto the surface and spread with a notched trowel. To obtain a uniform thickness, go over it in two directions with a spiked roller and, if required, after approximately 15 minutes (+20 °C) but before 30 minutes have elapsed, broadcast quartz sand, lightly at first and then to excess.
Do not apply where moisture is rising from the substrate. Freshly applied material must be protected from damp, condensation and water for at least 24 hours. Do not allow the primer to pond on the surface. The mortar coating is not suitable for frequent or permanent contact with water unless it is overcoated with another product. Practical trials must be carried out for epoxy mortar mixes to ensure a suitable aggregate grading. Outdoors, apply while temperatures are falling. If applied while temperatures are rising, “pinhole” voids may form owing to the increasing heat.